加拿大家园论坛

多伦多"Transit City" - 交通之城梦想 - 5年90亿加元

原文链接:https://forum.iask.ca/threads/252906/

admin : 2009-05-11#1
某种程度上,“金融危机” 对于多伦多,是一个前所未见的发展机遇。

当2009年4月, 安省政府提供90亿加元full funding大多伦多地区四个公交/地铁项目,多伦多”交通之城“ 的美梦开始触手可及.

多伦多"雄心勃勃"Transit City(轻轨地铁)蓝图:
http://www3.ttc.ca/About_the_TTC/Projects_and_initiatives/Transit_city/index.jsp

http://forum.iask.ca/showthread.php?t=226858

admin : 2009-05-11#2
回复: 多伦多的”交通之城“ 梦想 - 5年90亿加元

http://www.premier.gov.on.ca/news/event.php?ItemID=5232&Lang=EN

Quick Facts


Scarborough RT rehabilitation and extension is expected to be completed and in service by 2015.

The Eglinton rail line will run 31 kilometres from Kennedy Station to Pearson Airport and will include a 13 kilometre section built underground.

The Finch LRT will extend from Yonge Street west to Humber College and east to Don Mills Subway Station. Construction is expected to start in 2010 with completion by 2013.

York Viva construction will begin in 2009 with the first segment along Highway 7 from Markham Centre to Richmond Hill Centre, completed in 2011 and all segments in service by the end of 2013.

admin : 2009-05-11#3
回复: 多伦多"Transit City" - 交通之城梦想 - 5年90亿加元

直通机场的Eglinton环城轻轨线:



http://www.toronto.ca/involved/projects/eglinton_crosstown_lrt/index.htm

士嘉堡直通皮尔森国际机场的“Eglinton跨城高速线” (Eglinton Crosstown Rapid Transit)。该线全长31公里,横贯Toronto东西,总耗资46亿元。

线路的总体规划是:从皮尔森国际机场启程,沿Eglinton大道一路往东,途经Eglinton西站(U型地铁线Eglinton W)、Eglinton地铁站(U型线Eglinton)、GO Transit,直到今天轻轨蓝线(Scarborough LRT)的始发点肯尼迪地铁站(Kennedy station)。

其后,再将线路向东延伸至士嘉堡的最东端位于Finch和Nelsion的Malvern。


这条环城轻轨线投资巨大,会直接带来就业人口和推动经济发展,地铁建成后,便可乘坐地铁直接去机场,

同时这条30公里线路连接城市东西,使上班族减少了很多路上时间。

在这条长达30公里的轻轨线路中,从Keele街到Leslie街这段约11公里的路线是在地下,目的主要是避免影响路面上繁忙的交通、商业活动和人们的生活,至于其它部分皆在地面以上。工程将于2010年开始,2016年开始运营。

http://en.wikipedia.org/wiki/Eglinton_Crosstown_LRT_(TTC)

计划中的“轻轨出口”(地面每500 m一站, 地下每850 m一站):
沿Eglinton Avenue,从西到东:

Martin Grove Road
Widdicombe Hill Boulevard/Lloyd Manor Road
Kipling Avenue
Wincott Drive/Bemersyde Drive
Islington Avenue
Russell Road/Eden Valley Road
Royal York Road
Mulham Place
Scarlett Road
Eglinton Flats/Emmett Avenue
Jane Street (connection to future Jane LRT line)
Weston Road (possible future connection to Georgetown GO train line)
Black Creek Drive
Keele Street - 2 bay bus terminal proposed
Caledonia Road (possible future connection to Barrie GO train line)
Dufferin Street
Oakwood Avenue
Allen Road - Eglinton West Station (connection to Yonge-University-Spadina subway)
Bathurst Street
Chaplin Crescent
Avenue Road
Yonge Street - Eglinton Station (connection to Yonge-University-Spadina subway)
Mount Pleasant Road
Bayview Avenue
Laird Drive (with Brentcliffe Road, possible change in location, may be eliminated for one station only)
Brentcliffe Road (with Laird Drive, possible change in location, may be eliminated for one station only)
Leslie Street
Don Mills Road - 5 bay bus terminal proposed (connection to future Don Mills LRT line)
Ferrand Drive
Wynford Drive (possible future connection to Richmond Hill GO train line, if not on Swift Drive)
Swift Drive (possible future connection to Richmond Hill GO train line, if not on Wynford Drive)
Bermondsey Road
Victoria Park Avenue
Pharmacy Avenue
Lebovic Avenue
Warden Avenue
Birchmount Road
Ionview Road
Kennedy Road - Kennedy Station, Kennedy GO Station (connection to Bloor-Danforth subway, Scarborough RT, future Scarborough Malvern LRT line, and Stouffville GO train line)

admin : 2009-05-11#4
回复: 多伦多"Transit City" - 交通之城梦想 - 5年90亿加元

Finch轻轨地铁线(Finch Light Rail Transit):以央街(Yonge Street)为中心,西到汉伯学院(Humber College),东及Don Mills地铁站(紫线起始站)。

连接央街,Spadina 和 Sheppard地铁线路,Sheppard Avenue East东街轻铁线。

如果环境评估顺利通过,2010年将开始动工,2013年投入使用,总花费估计12亿。

http://en.wikipedia.org/wiki/Etobicoke-Finch_West_LRT_(TTC)

计划中的“轻轨出口”(每646 m一站):

沿 Finch Avenue,从西到东:

Westmore Drive
Martin Grove Road
Albion Road
Kipling Avenue
Islington Avenue
Duncanwoods Drive
Milvan Drive/Rumike Road
Weston Road
Signet Drive/Arrow Road
Norfinch Drive/Oakdale Road
Jane Street (connection to future Jane LRT line)
Driftwood Avenue
Tobermory Drive (under consideration)
Sentinel Road
Keele Street - Finch West Station (connection to future Yonge-University-Spadina subway extension)
Alexdon Road
Chesswood Drive
Alness Street/Champagne Drive
Dufferin Street
Wilmington Avenue
Torresdale Avenue/Goldfinch Court
Bathurst Street
Finchhurst Drive
Edithvale Drive
Yonge Street - Finch Station (connection to Yonge-University-Spadina subway)
Bayview Avenue
Leslie Street
Don Mills Road

admin : 2009-05-11#5
回复: 多伦多"Transit City" - 交通之城梦想 - 5年90亿加元

士嘉堡高速线(Scarborough Rapid Transit):该线路是Eglinton轻轨线延长版:即在该线路的基础上,

从肯尼迪车站(蓝线起始站)再往东延伸至马尔文小区(Malvern)中心或万锦路(Markham Rd),取代现有的士嘉堡高速交通设施。

此外,计划还对肯尼迪车站和McCowan车站之间的7.2千米的路线进行升级修建。

该线连接Bloor-Danforth地铁站,Sheppard East轻铁线以及GO Transit。

如果环境评估顺利通过,该线会在2010年动工,2015年投入使用,总计花费约14亿。

admin : 2009-05-11#6
回复: 多伦多"Transit City" - 交通之城梦想 - 5年90亿加元

约克VIVA高速公交线(York VIVA BRT):

该线是沿HWY-7号和央街的专用公交线路,连接央街地铁站和开往Barrie,Richmond Hill、Stouffville的GO Transit、万锦中心和烈治文山中心。

该线的环境评估已经通过,今年秋天即可动工,一期工程2011年即可使用,并将在2013年全部投入使用,花费共计约14亿。

自由云飞 : 2009-05-11#7
回复: 多伦多"Transit City" - 交通之城梦想 - 5年90亿加元

好消息

自由云飞 : 2009-05-11#8
回复: 多伦多"Transit City" - 交通之城梦想 - 5年90亿加元

有朝一日俺还是回多伦多的

admin : 2009-05-11#9
回复: 多伦多"Transit City" - 交通之城梦想 - 5年90亿加元

最后是我们著名的 Sheppard东线

从Don Mills 站至Meadowvale Road.

http://en.wikipedia.org/wiki/Sheppard_East_LRT_(TTC)

下月(2009年June)就开工,耗资9.5亿,预计2012建成,是大多伦多7大轻轨项目中第一条建成的:)

GarfieldCai : 2009-05-11#10
回复: 多伦多"Transit City" - 交通之城梦想 - 5年90亿加元

:wdb1:

奥利奥 : 2009-05-11#11
回复: 多伦多"Transit City" - 交通之城梦想 - 5年90亿加元

这么多钱的计划:联邦,ON, city各负担多少呢; city负担的部分多少会源自property tax和其他tax呢?

Flying Dragon : 2009-05-11#12
回复: 多伦多"Transit City" - 交通之城梦想 - 5年90亿加元

期待!!!

Chinese Canadian : 2009-05-11#13
回复: 多伦多"Transit City" - 交通之城梦想 - 5年90亿加元

就没有我们密市什么事

dg777 : 2009-05-11#14
回复: 多伦多"Transit City" - 交通之城梦想 - 5年90亿加元

对我家的房是好消息:wdb6:

dg777 : 2009-05-11#15
回复: 多伦多"Transit City" - 交通之城梦想 - 5年90亿加元

就没有我们密市什么事

欢迎来多伦多!:wdb6:

游客 : 2009-05-11#16
回复: 多伦多"Transit City" - 交通之城梦想 - 5年90亿加元

看起来不错, 不知道轻轨是什么样子, 可千万不要像 士嘉堡 原来的 RT

香香王子 : 2009-05-11#17
回复: 多伦多"Transit City" - 交通之城梦想 - 5年90亿加元

对我家的房是好消息:wdb6:

你家在哪一条地铁线上?

奥利奥 : 2009-05-12#18
回复: 多伦多"Transit City" - 交通之城梦想 - 5年90亿加元

对我家的房是好消息:wdb6:

不担心涨地税么?:wdb18::wdb17::wdb6:

游客 : 2009-05-15#19
回复: 多伦多"Transit City" - 交通之城梦想 - 5年90亿加元

不担心涨地税么?:wdb18::wdb17::wdb6:

地税涨起来,慢得多

onioncanada : 2009-05-15#20
回复: 多伦多"Transit City" - 交通之城梦想 - 5年90亿加元

很吵吧。。。

游客 : 2009-05-17#21
回复: 多伦多"Transit City" - 交通之城梦想 - 5年90亿加元

加油, 多伦多

有梦相随 : 2009-05-17#22
回复: 多伦多"Transit City" - 交通之城梦想 - 5年90亿加元

不错,好消息

lltfs : 2009-05-18#23
回复: 多伦多"Transit City" - 交通之城梦想 - 5年90亿加元

mark

ken22 : 2010-03-24#24
回复: 多伦多"Transit City" - 交通之城梦想 - 5年90亿加元

最后是我们著名的 Sheppard东线

从Don Mills 站至Meadowvale Road.

http://en.wikipedia.org/wiki/Sheppard_East_LRT_(TTC)

下月(2009年June)就开工,耗资9.5亿,预计2012建成,是大多伦多7大轻轨项目中第一条建成的:)
:wdb10:好帖。关注中。。。